The LMB remained functional and occupied while a compressed air system was being installed, so soldering could have posed a risk to building users.
Gary Smith, from GRS Mechanical, said: “We had to match an existing compressed air installation constructed from 22mm copper braised joints. Now a fully functioning building, it was hard to get a ‘hot works permit’, so Geberit Mapress was the obvious choice.”
Smith added: “As ever with Geberit Mapress, the installation went smoothly and the customer is extremely happy with the end result.”